Downloads read more ...
DYWIDAG Prestressing Systems using Bars,
Filesize:1.9 MB
Filesize:1.9 MB
ETA-05 0123 DYWIDAG PT Bar Tendon System,
Filesize:8.4 MB
Filesize:8.4 MB
Strands - Stressing Values and Stressing Record,
Filesize:70 kB
Filesize:70 kB
Bar - Calculation of Elongation 1/2,
Filesize:36 kB
Filesize:36 kB

DYWIDAG Prestressing Systems using Bars
Installation
DYWIDAG-SYSTEMS INTERNATIONAL offers a full line of special installation accessories to facilitate field assembly and installation. Installation shall be carried out by properly trained and experienced personnel. If desired, tendons can also be delivered to the jobsite prefabricated (e.g. unbonded bar tendons).
In the anchorage area, adequate space is created through a pocket former assembled at the formwork before concreting in order to put on the jack and for the grout cap.
Stressing End
- Valve
- Formwork
- Pocket Former
- Grout Tube
- Retaining Nut
- Hex Nut
- Domed Anchor Nut
- Anchor Plate
- Duct
- Duct Sleeve A
- Duct

- Jeju Port Extension, South Korea

- Woodrow Wilson Bridge, Washington, D.C., USA





