Downloads
| 213 t of DYWIDAG Post-Tensioning System for bridges in MuscatAlleviation of traffic congestion in Al-Khuwair and Al-Ghubrah areas, Muscat, Sultanate of OmanThe project is located in the areas of Al-Khuwair and Al-Ghubrah in the center of Muscat, the capital of Oman. The main highway in Muscat namely Sultan Qaboos Street runs in the east-west direction, therefore, all traffic going from south to north or vice versa has to exit through roundabouts that add to traffic congestion, especially at peak hours. The main objective was to alleviate traffic congestion in the roundabouts by building bridges. This project includes the following prestressed bridges:
|

