Downloads
| Innovative solution using restressable tie backsKwang-An Suspension Bridge in Kwang-An Beach, Pusan, South KoreaIn an exemplary manner DSI's new competence center strategy was put into practice on this project. After the main contractors Shodai / Japan and Yusin / Korea and the project engineer had been convinced that restressable DYWIDAG Bonded Multistrand Tendons were the preferred system to meet all construction requirements, DSI Korea was awarded the contract. In close cooperation with DSI Munich a special solution for the suspension bridge project was developed. |

