Downloads
| DYWIDAG Strand Post-Tensioning System successfully used in RussiaTulskaya bridge, Moscow, RussiaIn connection with the construction of an inner ring road in Moscow, the erection of a new 1,000 m long bridge became necessary. For his purpose a continuous post-tensioned hollow box girder with constant overall depth was chosen. The width of he bridge is 30 m and typical span 40 m. |

