Downloads
| Retrofit with DYWIDAG Multistrand TendonsThe Seismic Retrofit of the San Diego-Coronado Bay Bridge using DYWIDAG Multistrand and THREADBAR ® Post-Tensioning TendonsBuilt in 1969 the San Diego-Coronado Bay Bridge is an unmistakable landmark of downtown San Diego and one of the seven large state-owned toll bridges that are currently undergoing seismic upgrading. |

