Downloads
DYWI ® Drill Anchors secure Eichelberg TunnelEichelberg Tunnel, A71 Erfurt - Schweinfurt, Thuringia, GermanyIn connection with the new construction of federal highway A71 from Erfurt to Schweinfurt, the Eichelberg Tunnel has been under construction in the Suhl section since early March 2003. The tunneling works are to be completed by the end of July 2005, whereas the overall new section of the A71 is to be completed by 2006. |


Depending on the rock classification, the three and four part tunnel arcs are spaced between 0.75m and 1.75m to support the crown. The anchor systems comprise SN anchors 25mm and DYWI ® Drill Anchor bolt anchors R32N in anchor lengths from 4 m to 6 m according to the rock properties. The working face is supported with tubes 42.4mm,driven bars 28mm or self-drilling spiles, each 3.5m to 4m long.