DYWIDAG Permanent Strand Anchors for seismic upgrade of an apartment building in Peru
Kontiki Apartment Building, Playa Punta Hermosa, Lima, Peru

Client The Wiese Family, Miroquesada, Lima, Peru +++ Main Contractor Augusto Cánepa Ingenieros, Lima, Peru +++ Consulting Engineers Gallegos Casabonne Arango Ingenieros Civiles S.A.C., Lima, Peru

DSI Services Supply, preparation, assembly, testing and prestressing of 32 permanent DYWIDAG Strand Anchors with double corrosion protection in sizes up to 12-0.6" and of 3 tendons with 12 greased, sheathed strands Ø 0.6".

Seven Mile Dam, Southern BC, Canada – Successful completion of test anchor program with 90-0.6" anchors, length 98 m

Owner BC Hydro, Burnaby, BC, Canada +++ Engineer BC Hydro, Burnaby, BC, Canada +++ General Contractor Peter Kiewit & Son, Richmond, BC, Canada

DSI Services Supply of 3 approximately 98m long restressable DYWIDAG 90-0.6" Strand Anchors with Double Corrosion Protection; rental of 2,000 t jack and technical assistance for installation, testing and stressing

DYWIDAG Permanent Strand Anchors for seismic upgrade of a quay wall
EPC marine dock for the Q-Chem project, Mesaieed, Qatar

Owner Qatar Chemicals Company Ltd., Doha, Qatar +++ Contractor AMCON Project Management, Doha, Qatar +++ Subcontractor Swissboring Overseas Corp. Ltd., Dubai, U. A. E.

DSI Services Supply of all anchor components and required equipment for the fabrication and stressing of 100 double corrosion protected DYWIDAG Strand Anchors, 12 x 0,62", with a length of 40 m each; Supervision of anchor fabrication and installation as well as testing and stressing of the anchors

DYWIDAG Anchors prove to be best solution for dam upgrades
Forth River Dams upgrades, Tasmania, Australia

Client Hydro Tasmania, Hobart, Australia +++ General Contractor Hazell Bros. Civil Contracting Pty. Ltd., Hobart, Australia +++ Subcontractor Mulligan Drilling Pty. Ltd. Rockridge, Australia +++ Engineering Hydro Tasmania, Hobart, Australia +++ Consulting Engineers Hydro Tasmania, Hobart, Australia

DSI Services Supply of 30 t of Ø 36 mm and Ø 40 mm epoxy-coated DYWIDAG THREADBAR ®s and accessories for permanent passive rock bolts. Supply of 10 pcs. DYWIDAG Permanent Strand Anchors 8 x 0,6"; rental of tensioning equipment and field supervision during installation and stressing

Use of DYWIDAG Permanent Strand Anchors on permafrost – Grossglockner in the Austrian Alps
Stabilization of the Erzherzog Johann Hütte at a height of 3,454 m on Mount Grossglockner

Owner Austrian Alpine Club, Vienna, Austria +++ General Contractor Felbermayr GesmbH, FST Spezialtiefbau, Salzburg, Austria +++ Design Consultant and Authority inviting the tender Engineering Office Bmst. Ing. Gerhard Schimek, Spittal/Drau, Austria +++ Subsoil Expert Civil engineers Garber - Dalmatiner, Graz, Austria

DSI Services Supply of DYWIDAG Permanent Strand Anchors 5 x 0.6", service load 550 kN and GEWI ® Piles Ø 40 mm, incl. technical assistance