Downloads read more ...
DYWIDAG Prestressing Systems using Bars,
Filesize:2.0 MB
Filesize:2.0 MB
ETA-05 0123 DYWIDAG PT Bar Tendon System,
Filesize:8.4 MB
Filesize:8.4 MB
Strands - Stressing Values and Stressing Record,
Filesize:70 kB
Filesize:70 kB
Bar - Calculation of Elongation 1/2,
Filesize:36 kB
Filesize:36 kB
DYWIDAG Prestressing Systems using Bars
System Overview
| Bonded bar tendons | 26 WR | 32 WR | 36 WR | 40 WR | 47 WR | 32 WS | 36 WS |
| QR-plate anchorage with additional reinforcement | |||||||
| QR-plate anchorage without additional reinforcement | |||||||
| Rectangular solid plate anchorage with additional reinforcement | |||||||
| Rectangular solid plate anchorage without additional reinforcement | |||||||
| Square solid plate anchorage without additional reinforcement | |||||||
| Unbonded and external bar tendons | |||||||
| Rectangular solid plate anchorage with additional reinforcement | |||||||
| Square solid plate anchorage without additional reinforcement | |||||||
Overview of anchorages
![]() | Stressing anchorage, bonded | |
| The bar is fixed to the anchorage plate by the domed anchor nut and the retaining nut, the latter of which is fixed to the scaffolding. The retaining nut provides the connection to the duct. Grouting is performed through the grout cap, the domed anchor nut with the three grout slots and the retaining nut. | |
![]() | Fixed anchorage, bonded | |
| Usually, the fixed anchorage is completely embedded in the concrete. The domed anchor nut is tack welded perpendicularly onto the anchor plate. The duct sleeve B ends directly at the anchor plate, where the duct is both injected and vented. A fixed anchorage can be designed as stressing anchorage; the required bar-over length for the stressing can be dispensed. | |
![]() | Stressing ancorage, unbonded | |
| In order to prevent the intrusion of water in the anchorage region, a connection tube is welded to the anchor plate to bridge the gap behind the anchor plate. Different corrosion protection systems are available. | |
![]() | Fixed anchorage, unbonded | |
| Usually, the fixed anchorage is completely embedded in the concrete. The domed anchor nut is tack welded perpendicularly onto the anchor plate. The prestressing bar is provided with the respective corrosion protection. The fixed anchorage can also serve as unbonded stressing anchorage. | |








