DYWIDAG GEWI ® piles: the cost effective cast-in-place bridge foundation serving a healthy environmentVancouver Island, BC, Canada: Big Qualicum River Bridge
200 piles of Ø 57 mm DYWIDAG GEWI ® threadbar (average length 12 m) with double corrosion protection (DCP) were installed at even spacing under the four arch abutments (50 piles per footing). Pile spacing at the pile head was approximately 60 cm with pile inclinations ranging from 38' to 48' off horizontal. The soil consisted of a sand/gravel mixture, interspersed with cobbles and boulders, into which the 230 mm cased boreholes were drilled using a Krupp double head rotary drill with reverse hammer action. |