DYWIDAG Single Bar Tendons secure underground powerstationUnderground power station for the water authority Pont Ventoux, Val di Susa (Turin), ItalyThe hydroelectric power plant in Pont Ventoux is designed as an underground cavern station. Conventionally excavated, the cavern structure has a width of 21 m, a length of 50 m and varying depth of 21.5 m to 45.5 m. The hydro power station is equipped with two turbines and two generators to supply a capacity of 85 MW.
A double-layered reinforcement mat with fiber-reinforced shotcrete provides additional stabilization for the cavern.
In the roof DYWIDAG Single Bar Anchors 32 mm dia. St 835/1030 were placed in a grid of 2 m x 2 m and 2 m x 1.5 m respectively, based on the geomechanical requirements. The anchors were tensioned to 350 kN. |