| GEWI ® Piles for foundation upgrade in Aluminum SmelterVAW Kurri Kurri Pty. Ltd. Aluminum Smelter, Kurri Kurri, NSW, AustraliaEach time the molten aluminum product was transferred by crucible trailer across the mezzanine slab, the columns supporting the mezzanine experienced excessive deflection due to settlements in their foundations. After extensive engineering studies, the owner chose to reinforce the foundation with GEWI ® Piles. The decisive factors for the use of GEWI ® Piles were:
Measures taken at the VAW Kurri Kurri Pty.Ltd.
The reinforcement work was successfully completed in April 2002 to the owner’s satisfaction. |