| Construction of Egg Shaped Digester Tanks with DYWIDAG Post-Tensioning and SK4 Formwork SystemJurong Sewage Treatment Works - Phase III Extension, SingaporeIn its effort to free up more habitable area in land scarce Singapore, the Public Utilities Board is currently embarking on a major change in the design of its sewage water treatment structures. Deep Tunnel Sewage System (DTSS) has been introduced island wide to channel all untreated wastes from the townships to two main sewage treatment works situated in the East (Changi) and in the West (Tuas) of Singapore. |

