| DYWIDAG Systems support the greatest tunneling site on earthConstruction of a new high-speed railway from Bologna to Florence, ItalyThe high-speed railway from Bologna to Florence crosses the Appenines, an Italian mountain range with peaks up to 2,910 m high. The roject is with regard to size, complexity and use of financial and human resources unique in the world. The Bologna-Florence high-speed railway will be ut into operation in 2006, reducing travel time between the two cities to approximately 30 minutes.
Temporary 26.5 mm dia., grade 835/1030 and 36 mm dia., grade 1080/1230 DYWIDAG Bar Anchors, with lengths of 10 to 20 m as well as temporary 3 to 9-0.6" DYWIDAG Multistrand Anchors with lengths of 20 to 30 m were installed. Work on the various construction sites has been under way for more than 4 years and the project is now approximately 70% complete. The major construction work will be finished in 2003 and the high speed railway is scheduled to go into operation in 2006. |