Downloads
Maumee stay cable bridge breaks world recordNew River Crossing in Ohio, USAConstruction of the new six-lane high-level bridge over the Maumee river, which is located down-stream from the existing Craig Memorial Bridge near Toledo, Ohio, will start in autumn 2003. The region's new signature landmark bridge will have a vertical clearance of 36.5 m and a 122 m wide shipping channel; it's overall length will be 2,682 m. The stay cables, which will carry the bridge deck in a single plane of stays and from one pylon only are designed in accordance with the revolutionary "cradle system", developed by Figg Bridge Engineers, Inc., Tallahassee, Florida. In the new system the stays are not individually anchored into the pylon, but a continuous cable stay runs from the bridge deck, through the cradle at the top of the pylon, and back down to the bridge deck in the subsequent span. Download DSI Reference (pdf-format) |

