Owner Schiliftgesellschaft Sölden-Hochsölden, Ötztal +++ Design of Excavation Dr. Heiner Bertle, Ingenieurkonsulent für Techn. Geologie, Schruns +++ Contractor for Excavation Bietergemeinschaft ILBau GmbH-STUAG GmbH, Innsbruck +++ Execution of anchor works STUAG Bau GmbH Abt. Tiefbau, Wien
DSI Services Supply of 157 pieces of DYWIDAG Permanent Strand Anchors 4-0.6" St 1570/1770 (grade 250), service load 500kN, 20 of them adjustable; supply of electrical isolated anchors including measurements of resistance under supervision of DSI Munich.