With a length of approx. 167km, National Highway 1 in Cambodia connects the capital of Phnom Penh with the Bavet border crossing to Vietnam. Due to the increasing congestion on this important route, a decision was made to construct the Tsubasa Bridge in Neak Loeung 60km south-east of Phnom Penh. The structure is a three span stay cable bridge crossing the Mekong River.

The project also included the construction of two 900m and 675m long approach bridges. Both structures consist of 35 spans, each of which is 45m long. The precast concrete girders were fabricated in a construction yard and installed using two sets of erection girders. The precast girders were post-tensioned using Type 12S 15.2 DYWIDAG Strand Tendons, and Type 3S 15.2 DYWIDAG Strand Tendons were used for transverse post-tensioning.

The main bridge is 640m long and divided into three spans with lengths of 155m, 330m and 155m. The two pylons are 121m high measured from the pile cap and consist of two individual pillars on the outside of the bridge that are connected by several cross beams. The pylons rest on cast-in-place, 2.5m Ø concrete piles.

The main girder has a cross-section of 17m and a height of 1.8m. The bridge segments adjacent to the pylons were built first so that the stay cables could be installed at both pylons and anchored at the bridge deck.

This way, the stay cables supported the weight of the form traveler during the construction of the bridge sections between the pylons. These were constructed using an underslung form traveler in a 10 day construction cycle. In total, 930t of Type DG-P61, 55, 37, 31 and 22 DYNA Grip® Stay Cables were installed.

The stay cables are galvanized, waxed and inserted in HDPE ducts. In the main span area, transverse post-tensioning was carried out using 170t of 32mm Ø DYWIDAG Bar Tendons. The individual cross beams were stressed using 510t of Type 12S 15.2 horizontal DYWIDAG Strand Tendons.

Furthermore, 140t of Type 19S15.2 DYWIDAG Strand Post-Tensioning Systems and 200t of Types 5S 15.2, 7S 15.2 and 9S 15.2 DYWIDAG Strand Post-Tensioning Systems were used in the pylons. Additionally, 180t of 36mm Ø DYWIDAG Bar Tendons were installed in the pylons.

The Tsubasa Bridge is not only a new landmark of the region, but also the longest bridge in Cambodia.

Owner

Ministry of Public Works and Transport, Kingdom of Cambodia, Cambodia

General Contractor

Sumitomo Mitsui Construction Co., Ltd., Japan

Architect

Chodai Co., Ltd and Oriental Consultants Co., Ltd, Japan

Consulting

Chodai Co., Ltd and Oriental Consultants Co., Ltd, Japan


DSI Unit and DSI Licensee

DYWIDAG-Systems International GmbH, GBU, Germany; Sumitomo (SEI) Steel Wire Corp., Japan

DSI and Sumitomo Scope

Production, supply, installation, engineering services, technical support

DYWIDAG Products

Type DG-P61, 55, 37, 31 and 22 DYNA Grip® Stay Cables; Type 12S 15.2, 3S 15.2, 19S 15.2, 5S 15.2, 7S 15.2 and 9S 15.2 DYWIDAG Strand Tendons; 32mm and 36mm Ø DYWIDAG Bar Tendons